Powering Hyperscale Data Centres: Strategic Grid Solutions

OVERVIEW:

NEN Consulting was engaged by several leading property developers to conduct detailed power feasibility assessments for multiple large-scale development sites across Victoria, intended for hyperscale data centres requiring 100–1000+ megawatts (MW) of electricity supply. The objective was to identify optimal grid connection pathways, assess infrastructure constraints, and recommend cost-effective, scalable solutions to support future development.

Project budget: ~$25-60,000

Client

Several leading property developers

Year Completed

2024-Ongoing

Location

Various

Powering Hyperscale Data Centres

UTILITIES CHALLENGE:

The sites required high-voltage power supplies (66kV, 220kV, and 500kV) to meet projected demand while ensuring N-1 redundancy for reliability.

Key challenges included assessing terminal station and zone substation capacities, navigating long lead times for infrastructure upgrades, and coordinating with multiple stakeholders, including transmission and distribution network service providers and AEMO.

The connection strategy needed to balance technical feasibility, regulatory approvals, and alignment with clients’ development timelines.

 

SEAMLESS SOLUTION:

NEN Consulting delivered a comprehensive feasibility study for each site, analysing local terminal stations, distribution networks, and high- voltage line proximity using GIS tools and Distribution Annual Planning Reports (DAPR).

The team evaluated 66kV, 220kV, and 500kV connection options, factoring in infrastructure constraints, cost estimates, and delivery timelines. Through direct engagement with network service providers and AEMO, NEN developed tailored recommendations, including staged infrastructure plans and risk mitigation strategies.

The resulting strategic roadmap enabled clients to secure connection capacity and align energy infrastructure with their development programs.

 

MULTIDISCIPLINARY APPROACH:

NEN Consulting combined deep technical expertise with strategic regulatory engagement to guide clients through complex grid connection planning. Services included:

  • Load assessment and demand forecasting for hyperscale data centre requirements.
  • Analysis of terminal station and zone substation constraints.
  • Comparative cost modelling for 66kV, 220kV, and 500kV connection options.
  • GIS-based mapping of high-voltage line proximity and route planning.
  • Regulatory advice aligned with AEMO’s Victorian Transmission Connections framework.
  • Development of staged infrastructure recommendations and risk mitigation strategies.